Nutrient removal process development and full scale implementation at the 4 million p.e. main treatment plant of Vienna, Austria

The Main Treatment Plant of Vienna is in extension for 4 million p.e. and very stringent nutrient removal requirements. The existing high rate BOD removal activated sludge plant (in operation since 1980) is extended by a second stage activated sludge plant and a newly developed flow scheme for nitro...

Ausführliche Beschreibung

Bibliographische Detailangaben
Veröffentlicht in:Water science and technology : a journal of the International Association on Water Pollution Research. - 1986. - 50(2004), 7 vom: 23., Seite 19-26
1. Verfasser: Kroiss, H (VerfasserIn)
Weitere Verfasser: Klager, F, Winkler, S, Wandl, G, Svardal, K
Format: Aufsatz
Sprache:English
Veröffentlicht: 2004
Zugriff auf das übergeordnete Werk:Water science and technology : a journal of the International Association on Water Pollution Research
Schlagworte:Journal Article Industrial Waste Sewage Phosphorus 27YLU75U4W Nitrogen N762921K75
LEADER 01000naa a22002652 4500
001 NLM152207708
003 DE-627
005 20231223061539.0
007 tu
008 231223s2004 xx ||||| 00| ||eng c
028 5 2 |a pubmed24n0507.xml 
035 |a (DE-627)NLM152207708 
035 |a (NLM)15553454 
040 |a DE-627  |b ger  |c DE-627  |e rakwb 
041 |a eng 
100 1 |a Kroiss, H  |e verfasserin  |4 aut 
245 1 0 |a Nutrient removal process development and full scale implementation at the 4 million p.e. main treatment plant of Vienna, Austria 
264 1 |c 2004 
336 |a Text  |b txt  |2 rdacontent 
337 |a ohne Hilfsmittel zu benutzen  |b n  |2 rdamedia 
338 |a Band  |b nc  |2 rdacarrier 
500 |a Date Completed 09.02.2005 
500 |a Date Revised 21.11.2013 
500 |a published: Print 
500 |a Citation Status MEDLINE 
520 |a The Main Treatment Plant of Vienna is in extension for 4 million p.e. and very stringent nutrient removal requirements. The existing high rate BOD removal activated sludge plant (in operation since 1980) is extended by a second stage activated sludge plant and a newly developed flow scheme for nitrogen removal optimisation adaptable to the temperature variations over the year. For this plant pilot investigations have been performed for the development of a specific mathematical model (ASMV) and a specific aeration control strategy. The civil work of the extension is already finished and the installation of the equipment has started. Operation should start in 2004. The whole project will cost about [see symbol in text]264 million of which about one half is for civil work. The effluent standards correspond to the requirements for sensitive areas in EU Directive for Municipal Waste Water. The raw primary and excess sludge are incinerated after thickening and dewatering. This paper tries to condense the already existing literature with the construction progress and the cost situation 
650 4 |a Journal Article 
650 7 |a Industrial Waste  |2 NLM 
650 7 |a Sewage  |2 NLM 
650 7 |a Phosphorus  |2 NLM 
650 7 |a 27YLU75U4W  |2 NLM 
650 7 |a Nitrogen  |2 NLM 
650 7 |a N762921K75  |2 NLM 
700 1 |a Klager, F  |e verfasserin  |4 aut 
700 1 |a Winkler, S  |e verfasserin  |4 aut 
700 1 |a Wandl, G  |e verfasserin  |4 aut 
700 1 |a Svardal, K  |e verfasserin  |4 aut 
773 0 8 |i Enthalten in  |t Water science and technology : a journal of the International Association on Water Pollution Research  |d 1986  |g 50(2004), 7 vom: 23., Seite 19-26  |w (DE-627)NLM098149431  |x 0273-1223  |7 nnns 
773 1 8 |g volume:50  |g year:2004  |g number:7  |g day:23  |g pages:19-26 
912 |a GBV_USEFLAG_A 
912 |a SYSFLAG_A 
912 |a GBV_NLM 
912 |a GBV_ILN_350 
951 |a AR 
952 |d 50  |j 2004  |e 7  |b 23  |h 19-26