Nutrient removal process development and full scale implementation at the 4 million p.e. main treatment plant of Vienna, Austria

The Main Treatment Plant of Vienna is in extension for 4 million p.e. and very stringent nutrient removal requirements. The existing high rate BOD removal activated sludge plant (in operation since 1980) is extended by a second stage activated sludge plant and a newly developed flow scheme for nitro...

Ausführliche Beschreibung

Bibliographische Detailangaben
Veröffentlicht in:Water science and technology : a journal of the International Association on Water Pollution Research. - 1986. - 50(2004), 7 vom: 23., Seite 19-26
1. Verfasser: Kroiss, H (VerfasserIn)
Weitere Verfasser: Klager, F, Winkler, S, Wandl, G, Svardal, K
Format: Aufsatz
Sprache:English
Veröffentlicht: 2004
Zugriff auf das übergeordnete Werk:Water science and technology : a journal of the International Association on Water Pollution Research
Schlagworte:Journal Article Industrial Waste Sewage Phosphorus 27YLU75U4W Nitrogen N762921K75
Beschreibung
Zusammenfassung:The Main Treatment Plant of Vienna is in extension for 4 million p.e. and very stringent nutrient removal requirements. The existing high rate BOD removal activated sludge plant (in operation since 1980) is extended by a second stage activated sludge plant and a newly developed flow scheme for nitrogen removal optimisation adaptable to the temperature variations over the year. For this plant pilot investigations have been performed for the development of a specific mathematical model (ASMV) and a specific aeration control strategy. The civil work of the extension is already finished and the installation of the equipment has started. Operation should start in 2004. The whole project will cost about [see symbol in text]264 million of which about one half is for civil work. The effluent standards correspond to the requirements for sensitive areas in EU Directive for Municipal Waste Water. The raw primary and excess sludge are incinerated after thickening and dewatering. This paper tries to condense the already existing literature with the construction progress and the cost situation
Beschreibung:Date Completed 09.02.2005
Date Revised 21.11.2013
published: Print
Citation Status MEDLINE
ISSN:0273-1223