An analytical framework of "zero waste construction site" : Two case studies of Shenzhen, China

Copyright © 2020 Elsevier Ltd. All rights reserved.

Bibliographische Detailangaben
Veröffentlicht in:Waste management (New York, N.Y.). - 1999. - 121(2021) vom: 15. Feb., Seite 343-353
1. Verfasser: Lu, Weisheng (VerfasserIn)
Weitere Verfasser: Bao, Zhikang, Lee, Wendy M W, Chi, Bin, Wang, Jiayuan
Format: Online-Aufsatz
Sprache:English
Veröffentlicht: 2021
Zugriff auf das übergeordnete Werk:Waste management (New York, N.Y.)
Schlagworte:Journal Article Construction and demolition waste Construction waste management Net zero building Zero waste site Industrial Waste
LEADER 01000naa a22002652 4500
001 NLM319820521
003 DE-627
005 20231225172252.0
007 cr uuu---uuuuu
008 231225s2021 xx |||||o 00| ||eng c
024 7 |a 10.1016/j.wasman.2020.12.029  |2 doi 
028 5 2 |a pubmed24n1066.xml 
035 |a (DE-627)NLM319820521 
035 |a (NLM)33418446 
035 |a (PII)S0956-053X(20)30724-8 
040 |a DE-627  |b ger  |c DE-627  |e rakwb 
041 |a eng 
100 1 |a Lu, Weisheng  |e verfasserin  |4 aut 
245 1 3 |a An analytical framework of "zero waste construction site"  |b Two case studies of Shenzhen, China 
264 1 |c 2021 
336 |a Text  |b txt  |2 rdacontent 
337 |a ƒaComputermedien  |b c  |2 rdamedia 
338 |a ƒa Online-Ressource  |b cr  |2 rdacarrier 
500 |a Date Completed 02.02.2021 
500 |a Date Revised 02.02.2021 
500 |a published: Print-Electronic 
500 |a Citation Status MEDLINE 
520 |a Copyright © 2020 Elsevier Ltd. All rights reserved. 
520 |a Around the global construction industry, there is an emerging trend to pursue a "zero-waste" goal at the site level, but little is known about it. This paper aims to shed insights on the waste management concept of "zero waste construction site" by delineating its meaning, system boundary, assessment period, and operation strategies, which are further formulated in an analytical framework. Owing to the nascent nature of the concept, we adopted a qualitative approach including archival study, a series of semi-structured interviews, and two in-depth case studies in Shenzhen, China to sketch the analytical framework. Meanwhile, an analogy between "zero waste construction site" and "net zero building" is continuously made to fine-tune and finalize the framework. This research demonstrates that the zero-waste goal is challenging but achievable on individual construction sites. The system boundary to examine the zero-waste goal is contingent on the project scope, be it a new construction, renovation, or demolition project. The assessment period is dependent on the duration of the construction project. However, it would be too costly, if not entirely impossible, to achieve a "zero waste construction site" by treating it as a closed system. Rather, one needs to consider open, off-site strategies, e.g., engaging third-party recycling services, reusing recycled materials in subsequent projects, or trading it in to a recycled material market. The analytical framework can be utilized to scrutinize existing construction waste management practices. In the long term, the research will contribute positively to a "zero waste" society 
650 4 |a Journal Article 
650 4 |a Construction and demolition waste 
650 4 |a Construction waste management 
650 4 |a Net zero building 
650 4 |a Zero waste site 
650 7 |a Industrial Waste  |2 NLM 
700 1 |a Bao, Zhikang  |e verfasserin  |4 aut 
700 1 |a Lee, Wendy M W  |e verfasserin  |4 aut 
700 1 |a Chi, Bin  |e verfasserin  |4 aut 
700 1 |a Wang, Jiayuan  |e verfasserin  |4 aut 
773 0 8 |i Enthalten in  |t Waste management (New York, N.Y.)  |d 1999  |g 121(2021) vom: 15. Feb., Seite 343-353  |w (DE-627)NLM098197061  |x 1879-2456  |7 nnns 
773 1 8 |g volume:121  |g year:2021  |g day:15  |g month:02  |g pages:343-353 
856 4 0 |u http://dx.doi.org/10.1016/j.wasman.2020.12.029  |3 Volltext 
912 |a GBV_USEFLAG_A 
912 |a SYSFLAG_A 
912 |a GBV_NLM 
912 |a GBV_ILN_350 
951 |a AR 
952 |d 121  |j 2021  |b 15  |c 02  |h 343-353