Optimisation of waste clean-up after large-scale disasters

Copyright © 2020 Elsevier Ltd. All rights reserved.

Bibliographische Detailangaben
Veröffentlicht in:Waste management (New York, N.Y.). - 1999. - 119(2021) vom: 01. Jan., Seite 1-10
1. Verfasser: Cheng, Cheng (VerfasserIn)
Weitere Verfasser: Zhu, Rui, Costa, Alysson M, Thompson, Russell George
Format: Online-Aufsatz
Sprache:English
Veröffentlicht: 2021
Zugriff auf das übergeordnete Werk:Waste management (New York, N.Y.)
Schlagworte:Journal Article Buildings demolition arrangement Disaster waste clean-up Location selection Mixed integer programming Temporary disaster waste management site
LEADER 01000caa a22002652c 4500
001 NLM31602189X
003 DE-627
005 20250228044447.0
007 cr uuu---uuuuu
008 231225s2021 xx |||||o 00| ||eng c
024 7 |a 10.1016/j.wasman.2020.09.023  |2 doi 
028 5 2 |a pubmed25n1053.xml 
035 |a (DE-627)NLM31602189X 
035 |a (NLM)33032153 
035 |a (PII)S0956-053X(20)30534-1 
040 |a DE-627  |b ger  |c DE-627  |e rakwb 
041 |a eng 
100 1 |a Cheng, Cheng  |e verfasserin  |4 aut 
245 1 0 |a Optimisation of waste clean-up after large-scale disasters 
264 1 |c 2021 
336 |a Text  |b txt  |2 rdacontent 
337 |a ƒaComputermedien  |b c  |2 rdamedia 
338 |a ƒa Online-Ressource  |b cr  |2 rdacarrier 
500 |a Date Completed 14.12.2020 
500 |a Date Revised 14.12.2020 
500 |a published: Print-Electronic 
500 |a Citation Status MEDLINE 
520 |a Copyright © 2020 Elsevier Ltd. All rights reserved. 
520 |a Disaster waste clean-up after large disasters is one of the core activities at the recovery stage of disaster management, which aims to restoring the normal functioning of the disaster affected area. In this paper we considered a waste clean-up system consists of (i) demolition operation, (ii) collection of waste from customer nodes to temporary disaster waste management sites (TDWMSs), (iii) processing at TDWMSs, and (iv) transportation of the waste to final disposal sites in the recovery of disasters. A multi-objective mixed integer programming model is developed to minimise the total clean-up cost and time. Three different approaches are developed to solve the problem, which are tested with artificial instances and a real case study. Results of artificial instances indicate that the models developed can be used to obtain close to optimal solutions within an acceptable computing time. Results of the case study can facilitate the decision-makers to develop the waste clean-up with minimised total cost and clean-up time by selecting the right location of TDWMSs and setting up the proper waste clean-up schedule 
650 4 |a Journal Article 
650 4 |a Buildings demolition arrangement 
650 4 |a Disaster waste clean-up 
650 4 |a Location selection 
650 4 |a Mixed integer programming 
650 4 |a Temporary disaster waste management site 
700 1 |a Zhu, Rui  |e verfasserin  |4 aut 
700 1 |a Costa, Alysson M  |e verfasserin  |4 aut 
700 1 |a Thompson, Russell George  |e verfasserin  |4 aut 
773 0 8 |i Enthalten in  |t Waste management (New York, N.Y.)  |d 1999  |g 119(2021) vom: 01. Jan., Seite 1-10  |w (DE-627)NLM098197061  |x 1879-2456  |7 nnas 
773 1 8 |g volume:119  |g year:2021  |g day:01  |g month:01  |g pages:1-10 
856 4 0 |u http://dx.doi.org/10.1016/j.wasman.2020.09.023  |3 Volltext 