Cost implications of obtaining construction waste management-related credits in green building

Copyright © 2019 Elsevier Ltd. All rights reserved.

Bibliographische Detailangaben
Veröffentlicht in:Waste management (New York, N.Y.). - 1999. - 102(2020) vom: 01. Feb., Seite 722-731
1. Verfasser: Illankoon, I M Chethana S (VerfasserIn)
Weitere Verfasser: Lu, Weisheng
Format: Online-Aufsatz
Sprache:English
Veröffentlicht: 2020
Zugriff auf das übergeordnete Werk:Waste management (New York, N.Y.)
Schlagworte:Journal Article Construction waste Green building Hong Kong Life cycle costing Waste management
LEADER 01000naa a22002652 4500
001 NLM304071110
003 DE-627
005 20231225114205.0
007 cr uuu---uuuuu
008 231225s2020 xx |||||o 00| ||eng c
024 7 |a 10.1016/j.wasman.2019.11.024  |2 doi 
028 5 2 |a pubmed24n1013.xml 
035 |a (DE-627)NLM304071110 
035 |a (NLM)31805445 
035 |a (PII)S0956-053X(19)30718-4 
040 |a DE-627  |b ger  |c DE-627  |e rakwb 
041 |a eng 
100 1 |a Illankoon, I M Chethana S  |e verfasserin  |4 aut 
245 1 0 |a Cost implications of obtaining construction waste management-related credits in green building 
264 1 |c 2020 
336 |a Text  |b txt  |2 rdacontent 
337 |a ƒaComputermedien  |b c  |2 rdamedia 
338 |a ƒa Online-Ressource  |b cr  |2 rdacarrier 
500 |a Date Completed 30.12.2019 
500 |a Date Revised 30.12.2019 
500 |a published: Print-Electronic 
500 |a Citation Status MEDLINE 
520 |a Copyright © 2019 Elsevier Ltd. All rights reserved. 
520 |a This research was motivated by the intriguing phenomena across several economies that green building clients/developers are observably lukewarm in pursuing construction waste management (CWM). Recent studies, most of them in a qualitative nature, reported that to obtain CWM-related credits is "costlier" than obtaining credits from other green building aspects such as sites, lighting, and so on. Yet, there is a clear lack of empirical analysis of such cost implications with a view to providing convincing explanation to the phenomena. This research aims to identify the cost implications of achieving CWM-related credits as stipulated in green building rating tools by focusing in Hong Kong. The costs for using materials required for green certification were calculated and compared against conventional materials by introducing a life cycle perspective. It is discovered that to obtain the CWM-related credits, one needs to pay a higher cost ranging from 0.4% to 6% 
650 4 |a Journal Article 
650 4 |a Construction waste 
650 4 |a Green building 
650 4 |a Hong Kong 
650 4 |a Life cycle costing 
650 4 |a Waste management 
700 1 |a Lu, Weisheng  |e verfasserin  |4 aut 
773 0 8 |i Enthalten in  |t Waste management (New York, N.Y.)  |d 1999  |g 102(2020) vom: 01. Feb., Seite 722-731  |w (DE-627)NLM098197061  |x 1879-2456  |7 nnns 
773 1 8 |g volume:102  |g year:2020  |g day:01  |g month:02  |g pages:722-731 
856 4 0 |u http://dx.doi.org/10.1016/j.wasman.2019.11.024  |3 Volltext 
912 |a GBV_USEFLAG_A 
912 |a SYSFLAG_A 
912 |a GBV_NLM 
912 |a GBV_ILN_350 
951 |a AR 
952 |d 102  |j 2020  |b 01  |c 02  |h 722-731