GIS-based planning system for managing the flow of construction and demolition waste in Brazil

The objective of this article was to plan a network for municipal management of construction and demolition waste in Brazil with the assistance of a geographic information system, using the city of Recife as a case study. The methodology was carried out in three stages. The first was to map the ille...

Ausführliche Beschreibung

Bibliographische Detailangaben
Veröffentlicht in:Waste management & research : the journal of the International Solid Wastes and Public Cleansing Association, ISWA. - 1991. - 36(2018), 6 vom: 18. Juni, Seite 541-549
1. Verfasser: Paz, Diogo Henrique Fernandes da (VerfasserIn)
Weitere Verfasser: Lafayette, Kalinny Patrícia Vaz, Sobral, Maria do Carmo
Format: Online-Aufsatz
Sprache:English
Veröffentlicht: 2018
Zugriff auf das übergeordnete Werk:Waste management & research : the journal of the International Solid Wastes and Public Cleansing Association, ISWA
Schlagworte:Journal Article Construction and demolition waste decision support system management spatial analysis
LEADER 01000caa a22002652c 4500
001 NLM284224731
003 DE-627
005 20250223141100.0
007 cr uuu---uuuuu
008 231225s2018 xx |||||o 00| ||eng c
024 7 |a 10.1177/0734242X18772096  |2 doi 
028 5 2 |a pubmed25n0947.xml 
035 |a (DE-627)NLM284224731 
035 |a (NLM)29776320 
040 |a DE-627  |b ger  |c DE-627  |e rakwb 
041 |a eng 
100 1 |a Paz, Diogo Henrique Fernandes da  |e verfasserin  |4 aut 
245 1 0 |a GIS-based planning system for managing the flow of construction and demolition waste in Brazil 
264 1 |c 2018 
336 |a Text  |b txt  |2 rdacontent 
337 |a ƒaComputermedien  |b c  |2 rdamedia 
338 |a ƒa Online-Ressource  |b cr  |2 rdacarrier 
500 |a Date Completed 13.08.2018 
500 |a Date Revised 02.12.2018 
500 |a published: Print-Electronic 
500 |a Citation Status MEDLINE 
520 |a The objective of this article was to plan a network for municipal management of construction and demolition waste in Brazil with the assistance of a geographic information system, using the city of Recife as a case study. The methodology was carried out in three stages. The first was to map the illegal construction and demolition of waste disposal points across Recife and classify the waste according to its recyclability. In sequence, a method for indicating suitable areas for installation of voluntary delivery points, for small waste generators, are presented. Finally, a method for indicating suitable areas for the installation of trans-shipment and waste sorting areas, developed for large generators, is presented. The results show that a geographic information system is an essential tool in the planning of municipal construction and demolition waste management, in order to facilitate the spatial analysis and control the generation, sorting, collection, transportation, and final destination of construction and demolition waste, increasing the rate of recovery and recycling of materials 
650 4 |a Journal Article 
650 4 |a Construction and demolition waste 
650 4 |a decision support system 
650 4 |a management 
650 4 |a spatial analysis 
700 1 |a Lafayette, Kalinny Patrícia Vaz  |e verfasserin  |4 aut 
700 1 |a Sobral, Maria do Carmo  |e verfasserin  |4 aut 
773 0 8 |i Enthalten in  |t Waste management & research : the journal of the International Solid Wastes and Public Cleansing Association, ISWA  |d 1991  |g 36(2018), 6 vom: 18. Juni, Seite 541-549  |w (DE-627)NLM098164791  |x 1096-3669  |7 nnas 
773 1 8 |g volume:36  |g year:2018  |g number:6  |g day:18  |g month:06  |g pages:541-549 
856 4 0 |u http://dx.doi.org/10.1177/0734242X18772096  |3 Volltext 
912 |a GBV_USEFLAG_A 
912 |a SYSFLAG_A 
912 |a GBV_NLM 
912 |a GBV_ILN_350 
951 |a AR 
952 |d 36  |j 2018  |e 6  |b 18  |c 06  |h 541-549