Separating grey- and blackwater in urban water cycles - sensible in the view of misconnections?

The infrastructure approach SEMIZENTRAL has been developed for fast growing cities, to meet their challenges regarding water supply as well as biowaste and wastewater treatment. The world's first full-scale SEMIZENTRAL Resource Recovery Center (RRC) has been implemented in Qingdao (PR China). G...

Ausführliche Beschreibung

Bibliographische Detailangaben
Veröffentlicht in:Water science and technology : a journal of the International Association on Water Pollution Research. - 1986. - 76(2017), 5-6 vom: 01. Sept., Seite 1132-1139
1. Verfasser: Tolksdorf, J (VerfasserIn)
Weitere Verfasser: Cornel, P
Format: Online-Aufsatz
Sprache:English
Veröffentlicht: 2017
Zugriff auf das übergeordnete Werk:Water science and technology : a journal of the International Association on Water Pollution Research
Schlagworte:Journal Article Waste Water Water Pollutants, Chemical
LEADER 01000naa a22002652 4500
001 NLM275481735
003 DE-627
005 20231225005758.0
007 cr uuu---uuuuu
008 231225s2017 xx |||||o 00| ||eng c
024 7 |a 10.2166/wst.2017.293  |2 doi 
028 5 2 |a pubmed24n0918.xml 
035 |a (DE-627)NLM275481735 
035 |a (NLM)28876254 
040 |a DE-627  |b ger  |c DE-627  |e rakwb 
041 |a eng 
100 1 |a Tolksdorf, J  |e verfasserin  |4 aut 
245 1 0 |a Separating grey- and blackwater in urban water cycles - sensible in the view of misconnections? 
264 1 |c 2017 
336 |a Text  |b txt  |2 rdacontent 
337 |a ƒaComputermedien  |b c  |2 rdamedia 
338 |a ƒa Online-Ressource  |b cr  |2 rdacarrier 
500 |a Date Completed 23.02.2018 
500 |a Date Revised 07.12.2022 
500 |a published: Print 
500 |a Citation Status MEDLINE 
520 |a The infrastructure approach SEMIZENTRAL has been developed for fast growing cities, to meet their challenges regarding water supply as well as biowaste and wastewater treatment. The world's first full-scale SEMIZENTRAL Resource Recovery Center (RRC) has been implemented in Qingdao (PR China). Greywater (GW) and blackwater (BW) are collected and treated separately. Measurement of influent concentrations differ significantly from the design values. Thus, the operation strategy for the RRC had to be adapted. Amongst other reasons, the changed influent characteristic was caused by misconnections of GW and BW sewers. Already a misconnection rate of 6-8% requires an extension of the GW treatment process for nitrification/denitrification to fulfill effluent standards. Hence, measures should be taken to avoid or reduce misconnections. Nonetheless, in a semi-centralized scale (>10,000 inhabitants) a 100% avoidance might not be possible. Thus, consequences from misconnections should be considered during the design of source-oriented infrastructure systems 
650 4 |a Journal Article 
650 7 |a Waste Water  |2 NLM 
650 7 |a Water Pollutants, Chemical  |2 NLM 
700 1 |a Cornel, P  |e verfasserin  |4 aut 
773 0 8 |i Enthalten in  |t Water science and technology : a journal of the International Association on Water Pollution Research  |d 1986  |g 76(2017), 5-6 vom: 01. Sept., Seite 1132-1139  |w (DE-627)NLM098149431  |x 0273-1223  |7 nnns 
773 1 8 |g volume:76  |g year:2017  |g number:5-6  |g day:01  |g month:09  |g pages:1132-1139 
856 4 0 |u http://dx.doi.org/10.2166/wst.2017.293  |3 Volltext 
912 |a GBV_USEFLAG_A 
912 |a SYSFLAG_A 
912 |a GBV_NLM 
912 |a GBV_ILN_350 
951 |a AR 
952 |d 76  |j 2017  |e 5-6  |b 01  |c 09  |h 1132-1139