|
|
|
|
LEADER |
01000caa a22002652 4500 |
001 |
NLM261854747 |
003 |
DE-627 |
005 |
20250220081957.0 |
007 |
cr uuu---uuuuu |
008 |
231224s2016 xx |||||o 00| ||eng c |
024 |
7 |
|
|a 10.1177/0734242X16652959
|2 doi
|
028 |
5 |
2 |
|a pubmed25n0872.xml
|
035 |
|
|
|a (DE-627)NLM261854747
|
035 |
|
|
|a (NLM)27354014
|
040 |
|
|
|a DE-627
|b ger
|c DE-627
|e rakwb
|
041 |
|
|
|a eng
|
100 |
1 |
|
|a Kerestecioğlu, Merih
|e verfasserin
|4 aut
|
245 |
1 |
0 |
|a Quantitative option analysis for implementation and management of landfills
|
264 |
|
1 |
|c 2016
|
336 |
|
|
|a Text
|b txt
|2 rdacontent
|
337 |
|
|
|a ƒaComputermedien
|b c
|2 rdamedia
|
338 |
|
|
|a ƒa Online-Ressource
|b cr
|2 rdacarrier
|
500 |
|
|
|a Date Completed 13.04.2017
|
500 |
|
|
|a Date Revised 13.04.2017
|
500 |
|
|
|a published: Print-Electronic
|
500 |
|
|
|a Citation Status MEDLINE
|
520 |
|
|
|a © The Author(s) 2016.
|
520 |
|
|
|a The selection of the most feasible strategy for implementation of landfills is a challenging step. Potential implementation options of landfills cover a wide range, from conventional construction contracts to the concessions. Montenegro, seeking to improve the efficiency of the public services while maintaining affordability, was considering privatisation as a way to reduce public spending on service provision. In this study, to determine the most feasible model for construction and operation of a regional landfill, a quantitative risk analysis was implemented with four steps: (i) development of a global risk matrix; (ii) assignment of qualitative probabilities of occurrences and magnitude of impacts; (iii) determination of the risks to be mitigated, monitored, controlled or ignored; (iv) reduction of the main risk elements; and (v) incorporation of quantitative estimates of probability of occurrence and expected impact for each risk element in the reduced risk matrix. The evaluated scenarios were: (i) construction and operation of the regional landfill by the public sector; (ii) construction and operation of the landfill by private sector and transfer of the ownership to the public sector after a pre-defined period; and (iii) operation of the landfill by the private sector, without ownership. The quantitative risk assessment concluded that introduction of a public private partnership is not the most feasible option, unlike the common belief in several public institutions in developing countries. A management contract for the first years of operation was advised to be implemented, after which, a long term operating contract may follow
|
650 |
|
4 |
|a Journal Article
|
650 |
|
4 |
|a Landfill management
|
650 |
|
4 |
|a investment strategy
|
650 |
|
4 |
|a option analysis
|
650 |
|
4 |
|a public private partnership
|
650 |
|
4 |
|a risk assessment
|
650 |
|
4 |
|a solid waste management strategy
|
773 |
0 |
8 |
|i Enthalten in
|t Waste management & research : the journal of the International Solid Wastes and Public Cleansing Association, ISWA
|d 1991
|g 34(2016), 9 vom: 29. Sept., Seite 905-11
|w (DE-627)NLM098164791
|x 1096-3669
|7 nnns
|
773 |
1 |
8 |
|g volume:34
|g year:2016
|g number:9
|g day:29
|g month:09
|g pages:905-11
|
856 |
4 |
0 |
|u http://dx.doi.org/10.1177/0734242X16652959
|3 Volltext
|
912 |
|
|
|a GBV_USEFLAG_A
|
912 |
|
|
|a SYSFLAG_A
|
912 |
|
|
|a GBV_NLM
|
912 |
|
|
|a GBV_ILN_350
|
951 |
|
|
|a AR
|
952 |
|
|
|d 34
|j 2016
|e 9
|b 29
|c 09
|h 905-11
|