|
|
|
|
LEADER |
01000naa a22002652 4500 |
001 |
NLM249820978 |
003 |
DE-627 |
005 |
20231224154414.0 |
007 |
cr uuu---uuuuu |
008 |
231224s2015 xx |||||o 00| ||eng c |
024 |
7 |
|
|a 10.1177/0734242X15587368
|2 doi
|
028 |
5 |
2 |
|a pubmed24n0832.xml
|
035 |
|
|
|a (DE-627)NLM249820978
|
035 |
|
|
|a (NLM)26060234
|
040 |
|
|
|a DE-627
|b ger
|c DE-627
|e rakwb
|
041 |
|
|
|a eng
|
100 |
1 |
|
|a Athanasiou, C J
|e verfasserin
|4 aut
|
245 |
1 |
0 |
|a Feasibility analysis of municipal solid waste mass burning in the Region of East Macedonia--Thrace in Greece
|
264 |
|
1 |
|c 2015
|
336 |
|
|
|a Text
|b txt
|2 rdacontent
|
337 |
|
|
|a ƒaComputermedien
|b c
|2 rdamedia
|
338 |
|
|
|a ƒa Online-Ressource
|b cr
|2 rdacarrier
|
500 |
|
|
|a Date Completed 10.03.2016
|
500 |
|
|
|a Date Revised 10.06.2015
|
500 |
|
|
|a published: Print
|
500 |
|
|
|a Citation Status MEDLINE
|
520 |
|
|
|a © The Author(s) 2015.
|
520 |
|
|
|a The present work conducts a preliminary techno-economic feasibility study for a single municipal solid waste mass burning to an electricity plant for the total municipal solid waste potential of the Region of Eastern Macedonia - Thrace, in Greece. For a certain applied and highly efficient technology and an installed capacity of 400,000 t of municipal solid waste per year, the available electrical power to grid would be approximately 260 GWh per year (overall plant efficiency 20.5% of the lower heating value). The investment for such a plant was estimated at €200m. Taking into account that 37.9% of the municipal solid waste lower heating value can be attributed to their renewable fractions, and Greek Law 3851/2010, which transposes Directive 2009/28/EC for Renewable Energy Sources, the price of the generated electricity was calculated at €53.19/MWhe. Under these conditions, the economic feasibility of such an investment depends crucially on the imposed gate fees. Thus, in the gate fee range of 50-110 € t(-1), the internal rate of return increases from 5% to above 15%, whereas the corresponding pay-out time periods decrease from 11 to about 4 years
|
650 |
|
4 |
|a Journal Article
|
650 |
|
4 |
|a Municipal solid waste
|
650 |
|
4 |
|a economic feasibility
|
650 |
|
4 |
|a incineration gate fee
|
650 |
|
4 |
|a mass burning to electricity
|
650 |
|
4 |
|a waste to energy
|
650 |
|
7 |
|a Solid Waste
|2 NLM
|
700 |
1 |
|
|a Tsalkidis, D A
|e verfasserin
|4 aut
|
700 |
1 |
|
|a Kalogirou, E
|e verfasserin
|4 aut
|
700 |
1 |
|
|a Voudrias, E A
|e verfasserin
|4 aut
|
773 |
0 |
8 |
|i Enthalten in
|t Waste management & research : the journal of the International Solid Wastes and Public Cleansing Association, ISWA
|d 1991
|g 33(2015), 6 vom: 01. Juni, Seite 561-9
|w (DE-627)NLM098164791
|x 1096-3669
|7 nnns
|
773 |
1 |
8 |
|g volume:33
|g year:2015
|g number:6
|g day:01
|g month:06
|g pages:561-9
|
856 |
4 |
0 |
|u http://dx.doi.org/10.1177/0734242X15587368
|3 Volltext
|
912 |
|
|
|a GBV_USEFLAG_A
|
912 |
|
|
|a SYSFLAG_A
|
912 |
|
|
|a GBV_NLM
|
912 |
|
|
|a GBV_ILN_350
|
951 |
|
|
|a AR
|
952 |
|
|
|d 33
|j 2015
|e 6
|b 01
|c 06
|h 561-9
|