Solid waste management scenarios for Cetinje in Montenegro
© The Author(s) 2015.
| Veröffentlicht in: | Waste management & research : the journal of the International Solid Wastes and Public Cleansing Association, ISWA. - 1991. - 33(2015), 5 vom: 15. Mai, Seite 477-85 |
|---|---|
| 1. Verfasser: | |
| Weitere Verfasser: | , , , , , |
| Format: | Online-Aufsatz |
| Sprache: | English |
| Veröffentlicht: |
2015
|
| Zugriff auf das übergeordnete Werk: | Waste management & research : the journal of the International Solid Wastes and Public Cleansing Association, ISWA |
| Schlagworte: | Journal Article Solid waste management financial evaluation optimum scenario recycling Solid Waste |
| Zusammenfassung: | © The Author(s) 2015. This study presents the options for source-segregation and selective collection of recyclable waste fractions for Cetinje, Montenegro, with the aim of meeting the European Union 50% waste recycling target in 2023, and extending collection and disposal system that builds on the existing strengths of the city. To this end, three options were considered: (1) source separation and separate collection of dry recyclable materials and central sorting of residual waste; (2) source separation and collection of co-mingled dry recyclable materials, and central sorting in a clean material recovery facility of comingled recyclables and central sorting of residual waste; (3) collection of mixed waste (current situation) and subsequent central sorting. Scenarios 1 and 2 were found to meet the European Union 50% recycling target in 2023, provided that a fast implementation of the new separate collection schemes to fine sort the co-mingled collected recyclable materials is available. Finally, a financial evaluation was made for the options and the investment and operational costs over a 20-year period were estimated. Unit costs for Scenario 3 were found to be lower than for Scenario 1 and 2. As Scenario 3 will not meet the future European Union recycling targets, Scenario 2 has been pointed as the most feasible scenario for Cetinje, with reference to the expected lower total costs compared with Scenario 1 |
|---|---|
| Beschreibung: | Date Completed 24.02.2016 Date Revised 02.12.2018 published: Print-Electronic Citation Status MEDLINE |
| ISSN: | 1096-3669 |
| DOI: | 10.1177/0734242X15574563 |