A compact tool for coaxial laser alignment on a time-sharing beamline at Taiwan Light Source

A simple design and easily installed tool for alignment has been developed for time-sharing undulator beamlines. A laser beam is directed onto a beam splitter inside the vacuum chamber, then reflects 90° along the synchrotron beam path; this beam serves as a reference to mimic the synchrotron beam p...

Ausführliche Beschreibung

Bibliographische Detailangaben
Veröffentlicht in:Journal of synchrotron radiation. - 1994. - 21(2014), Pt 5 vom: 22. Sept., Seite 1213-4
1. Verfasser: Yuh, Jih Young (VerfasserIn)
Format: Online-Aufsatz
Sprache:English
Veröffentlicht: 2014
Zugriff auf das übergeordnete Werk:Journal of synchrotron radiation
Schlagworte:Journal Article Taiwan Light Source laser alignment multi-branch beamline two-stage differential pumping system
LEADER 01000caa a22002652 4500
001 NLM241492955
003 DE-627
005 20250217105732.0
007 cr uuu---uuuuu
008 231224s2014 xx |||||o 00| ||eng c
024 7 |a 10.1107/S1600577514013897  |2 doi 
028 5 2 |a pubmed25n0804.xml 
035 |a (DE-627)NLM241492955 
035 |a (NLM)25178015 
040 |a DE-627  |b ger  |c DE-627  |e rakwb 
041 |a eng 
100 1 |a Yuh, Jih Young  |e verfasserin  |4 aut 
245 1 2 |a A compact tool for coaxial laser alignment on a time-sharing beamline at Taiwan Light Source 
264 1 |c 2014 
336 |a Text  |b txt  |2 rdacontent 
337 |a ƒaComputermedien  |b c  |2 rdamedia 
338 |a ƒa Online-Ressource  |b cr  |2 rdacarrier 
500 |a Date Completed 30.03.2015 
500 |a Date Revised 02.09.2014 
500 |a published: Print-Electronic 
500 |a Citation Status PubMed-not-MEDLINE 
520 |a A simple design and easily installed tool for alignment has been developed for time-sharing undulator beamlines. A laser beam is directed onto a beam splitter inside the vacuum chamber, then reflects 90° along the synchrotron beam path; this beam serves as a reference to mimic the synchrotron beam path. Use of this tool greatly abbreviated alignment of an end-station after beamline switching; both beamline diagnosis and end-station development can be completed before the synchrotron beam time begins 
650 4 |a Journal Article 
650 4 |a Taiwan Light Source 
650 4 |a laser alignment 
650 4 |a multi-branch beamline 
650 4 |a two-stage differential pumping system 
773 0 8 |i Enthalten in  |t Journal of synchrotron radiation  |d 1994  |g 21(2014), Pt 5 vom: 22. Sept., Seite 1213-4  |w (DE-627)NLM09824129X  |x 1600-5775  |7 nnns 
773 1 8 |g volume:21  |g year:2014  |g number:Pt 5  |g day:22  |g month:09  |g pages:1213-4 
856 4 0 |u http://dx.doi.org/10.1107/S1600577514013897  |3 Volltext 
912 |a GBV_USEFLAG_A 
912 |a SYSFLAG_A 
912 |a GBV_NLM 
912 |a GBV_ILN_40 
912 |a GBV_ILN_350 
912 |a GBV_ILN_2005 
951 |a AR 
952 |d 21  |j 2014  |e Pt 5  |b 22  |c 09  |h 1213-4