25th anniversary article : Rise to power--OPV-based solar parks

A solar park based on polymer solar cells is described and analyzed with respect to performance, practicality, installation speed, and energy payback time. It is found that a high voltage installation where solar cells are all printed in series enables an installation rate in Watts installed per min...

Ausführliche Beschreibung

Bibliographische Detailangaben
Veröffentlicht in:Advanced materials (Deerfield Beach, Fla.). - 1998. - 26(2014), 1 vom: 08. Jan., Seite 29-38
1. Verfasser: Krebs, Frederik C (VerfasserIn)
Weitere Verfasser: Espinosa, Nieves, Hösel, Markus, Søndergaard, Roar R, Jørgensen, Mikkel
Format: Online-Aufsatz
Sprache:English
Veröffentlicht: 2014
Zugriff auf das übergeordnete Werk:Advanced materials (Deerfield Beach, Fla.)
Schlagworte:Journal Article Research Support, Non-U.S. Gov't
LEADER 01000naa a22002652 4500
001 NLM237452820
003 DE-627
005 20231224111704.0
007 cr uuu---uuuuu
008 231224s2014 xx |||||o 00| ||eng c
028 5 2 |a pubmed24n0791.xml 
035 |a (DE-627)NLM237452820 
035 |a (NLM)24741693 
040 |a DE-627  |b ger  |c DE-627  |e rakwb 
041 |a eng 
100 1 |a Krebs, Frederik C  |e verfasserin  |4 aut 
245 1 0 |a 25th anniversary article  |b Rise to power--OPV-based solar parks 
264 1 |c 2014 
336 |a Text  |b txt  |2 rdacontent 
337 |a ƒaComputermedien  |b c  |2 rdamedia 
338 |a ƒa Online-Ressource  |b cr  |2 rdacarrier 
500 |a Date Completed 13.11.2014 
500 |a Date Revised 30.09.2020 
500 |a published: Print 
500 |a Citation Status PubMed-not-MEDLINE 
520 |a A solar park based on polymer solar cells is described and analyzed with respect to performance, practicality, installation speed, and energy payback time. It is found that a high voltage installation where solar cells are all printed in series enables an installation rate in Watts installed per minute that far exceed any other PV technology in existence. The energy payback time for the practical installation of polymer solar cell foil on a wooden 250 square meter platform in its present form is 277 days when operated in Denmark and 180 days when operated in southern Spain. The installation and de-installation rate is above 100 m min⁻¹, which, with the present performance and web width, implies installation of >200 W min⁻¹. In comparison, this also exceeds the overall manufacturing speed of the polymer solar cell foil with a width of 305 mm which is currently 1 m min⁻¹ for complete encapsulated and tested foil. It is also significant that simultaneous installation and de-installation which enables efficient schemes for decommissioning and recycling is possible. It is highlighted where research efforts should most rationally be invested in order to make grid electricity from OPV a reality (and it is within reach) 
650 4 |a Journal Article 
650 4 |a Research Support, Non-U.S. Gov't 
700 1 |a Espinosa, Nieves  |e verfasserin  |4 aut 
700 1 |a Hösel, Markus  |e verfasserin  |4 aut 
700 1 |a Søndergaard, Roar R  |e verfasserin  |4 aut 
700 1 |a Jørgensen, Mikkel  |e verfasserin  |4 aut 
773 0 8 |i Enthalten in  |t Advanced materials (Deerfield Beach, Fla.)  |d 1998  |g 26(2014), 1 vom: 08. Jan., Seite 29-38  |w (DE-627)NLM098206397  |x 1521-4095  |7 nnns 
773 1 8 |g volume:26  |g year:2014  |g number:1  |g day:08  |g month:01  |g pages:29-38 
912 |a GBV_USEFLAG_A 
912 |a SYSFLAG_A 
912 |a GBV_NLM 
912 |a GBV_ILN_350 
951 |a AR 
952 |d 26  |j 2014  |e 1  |b 08  |c 01  |h 29-38