Optimization of a full-scale Unitank wastewater treatment plant for biological phosphorus removal

The Unitank process combines the advantages of traditional continuous-flow activated sludge processes and sequencing batch reactors, and has been extensively employed in many wastewater treatment plants (WWTPs) in China. Biological phosphorus removal (BPR) of a full-scale Unitank WWTP was optimized...

Ausführliche Beschreibung

Bibliographische Detailangaben
Veröffentlicht in:Environmental technology. - 1998. - 35(2014), 5-8 vom: 30. März, Seite 766-72
1. Verfasser: Zhou, Zhen (VerfasserIn)
Weitere Verfasser: Xing, Can, Wu, Zhichao, Tong, Fei, Wang, Junru
Format: Aufsatz
Sprache:English
Veröffentlicht: 2014
Zugriff auf das übergeordnete Werk:Environmental technology
Schlagworte:Journal Article Research Support, Non-U.S. Gov't Sewage Waste Water Water Pollutants, Chemical Phosphorus 27YLU75U4W Carbon 7440-44-0
LEADER 01000caa a22002652 4500
001 NLM236540033
003 DE-627
005 20250216194511.0
007 tu
008 231224s2014 xx ||||| 00| ||eng c
028 5 2 |a pubmed25n0788.xml 
035 |a (DE-627)NLM236540033 
035 |a (NLM)24645458 
040 |a DE-627  |b ger  |c DE-627  |e rakwb 
041 |a eng 
100 1 |a Zhou, Zhen  |e verfasserin  |4 aut 
245 1 0 |a Optimization of a full-scale Unitank wastewater treatment plant for biological phosphorus removal 
264 1 |c 2014 
336 |a Text  |b txt  |2 rdacontent 
337 |a ohne Hilfsmittel zu benutzen  |b n  |2 rdamedia 
338 |a Band  |b nc  |2 rdacarrier 
500 |a Date Completed 10.04.2014 
500 |a Date Revised 07.12.2022 
500 |a published: Print 
500 |a Citation Status MEDLINE 
520 |a The Unitank process combines the advantages of traditional continuous-flow activated sludge processes and sequencing batch reactors, and has been extensively employed in many wastewater treatment plants (WWTPs) in China. Biological phosphorus removal (BPR) of a full-scale Unitank WWTP was optimized by increasing anaerobic time from 80 to 120 min in an operation cycle of 360 min and reducing solid retention time (SRT) from 21.3 to 13.1 d. The BPR efficiency of the full-scale Unitank system increased from 63.8% (SRT of 21.3 d) to 83.2% for a SRT of 13.1 d. When the anaerobic time increased from 80 to 120 min, the net anaerobic phosphorus release amount increased from 0.25 to 1.06 mg L(-1), and sludge phosphorus content rose from 13.8 to 15.0 mgP x (gSS)(-1). During half an operation cycle, the average specific phosphorus release rate increased from 0.097mgP x (gVSS x h)(-1) in 0-40 min to 0.825 mgP x (gVSS x h)(-1) in 40-60 min. Reducing SRT and increasing anaerobic time account for 84.6% and 15.4% in the total increment of phosphorus removal of 1.15 mgL(-1) 
650 4 |a Journal Article 
650 4 |a Research Support, Non-U.S. Gov't 
650 7 |a Sewage  |2 NLM 
650 7 |a Waste Water  |2 NLM 
650 7 |a Water Pollutants, Chemical  |2 NLM 
650 7 |a Phosphorus  |2 NLM 
650 7 |a 27YLU75U4W  |2 NLM 
650 7 |a Carbon  |2 NLM 
650 7 |a 7440-44-0  |2 NLM 
700 1 |a Xing, Can  |e verfasserin  |4 aut 
700 1 |a Wu, Zhichao  |e verfasserin  |4 aut 
700 1 |a Tong, Fei  |e verfasserin  |4 aut 
700 1 |a Wang, Junru  |e verfasserin  |4 aut 
773 0 8 |i Enthalten in  |t Environmental technology  |d 1998  |g 35(2014), 5-8 vom: 30. März, Seite 766-72  |w (DE-627)NLM098202545  |x 0959-3330  |7 nnns 
773 1 8 |g volume:35  |g year:2014  |g number:5-8  |g day:30  |g month:03  |g pages:766-72 
912 |a GBV_USEFLAG_A 
912 |a SYSFLAG_A 
912 |a GBV_NLM 
912 |a GBV_ILN_350 
951 |a AR 
952 |d 35  |j 2014  |e 5-8  |b 30  |c 03  |h 766-72