Comparison of the inspector and rating protocol uncertainty influence in the condition rating of sewers

Wastewater drainage systems asset management decisions, in particular regarding rehabilitation interventions, are largely dependent on close-circuit television (CCTV) inspection results. However, the results of CCTV inspections are affected by several sources of uncertainty. Within the present commu...

Ausführliche Beschreibung

Bibliographische Detailangaben
Veröffentlicht in:Water science and technology : a journal of the International Association on Water Pollution Research. - 1986. - 69(2014), 4 vom: 15., Seite 862-7
1. Verfasser: Sousa, V (VerfasserIn)
Weitere Verfasser: Ferreira, F M, Meireles, I, Almeida, N, Saldanha Matos, J
Format: Online-Aufsatz
Sprache:English
Veröffentlicht: 2014
Zugriff auf das übergeordnete Werk:Water science and technology : a journal of the International Association on Water Pollution Research
Schlagworte:Journal Article Research Support, Non-U.S. Gov't Sewage
LEADER 01000caa a22002652 4500
001 NLM235848220
003 DE-627
005 20250216180719.0
007 cr uuu---uuuuu
008 231224s2014 xx |||||o 00| ||eng c
024 7 |a 10.2166/wst.2013.764  |2 doi 
028 5 2 |a pubmed25n0786.xml 
035 |a (DE-627)NLM235848220 
035 |a (NLM)24569288 
040 |a DE-627  |b ger  |c DE-627  |e rakwb 
041 |a eng 
100 1 |a Sousa, V  |e verfasserin  |4 aut 
245 1 0 |a Comparison of the inspector and rating protocol uncertainty influence in the condition rating of sewers 
264 1 |c 2014 
336 |a Text  |b txt  |2 rdacontent 
337 |a ƒaComputermedien  |b c  |2 rdamedia 
338 |a ƒa Online-Ressource  |b cr  |2 rdacarrier 
500 |a Date Completed 17.04.2014 
500 |a Date Revised 26.02.2014 
500 |a published: Print 
500 |a Citation Status MEDLINE 
520 |a Wastewater drainage systems asset management decisions, in particular regarding rehabilitation interventions, are largely dependent on close-circuit television (CCTV) inspection results. However, the results of CCTV inspections are affected by several sources of uncertainty. Within the present communication, the inspector's uncertainty is quantified by comparing periodic inspection reports from three trunk sewers of a Portuguese sewer system. The inspections were carried out by the same experienced inspector using the same equipment. Therefore, the uncertainties from the lack of experience and the difference of the inspector and equipment were ruled out. The protocol uncertainty is also quantified comparing the results obtained with the Water Research Center (WRc) and the National Research Council of Canada (NRC) protocols condition ratings. Both operational and structural condition rating were analysed, but emphasis was given to the later since it dictates the repair and replacement interventions 
650 4 |a Journal Article 
650 4 |a Research Support, Non-U.S. Gov't 
650 7 |a Sewage  |2 NLM 
700 1 |a Ferreira, F M  |e verfasserin  |4 aut 
700 1 |a Meireles, I  |e verfasserin  |4 aut 
700 1 |a Almeida, N  |e verfasserin  |4 aut 
700 1 |a Saldanha Matos, J  |e verfasserin  |4 aut 
773 0 8 |i Enthalten in  |t Water science and technology : a journal of the International Association on Water Pollution Research  |d 1986  |g 69(2014), 4 vom: 15., Seite 862-7  |w (DE-627)NLM098149431  |x 0273-1223  |7 nnns 
773 1 8 |g volume:69  |g year:2014  |g number:4  |g day:15  |g pages:862-7 
856 4 0 |u http://dx.doi.org/10.2166/wst.2013.764  |3 Volltext 
912 |a GBV_USEFLAG_A 
912 |a SYSFLAG_A 
912 |a GBV_NLM 
912 |a GBV_ILN_350 
951 |a AR 
952 |d 69  |j 2014  |e 4  |b 15  |h 862-7