Simultaneous personnel and vehicle shift scheduling in the waste management sector

Copyright © 2013 Elsevier Ltd. All rights reserved.

Détails bibliographiques
Publié dans:Waste management (New York, N.Y.). - 1999. - 33(2013), 7 vom: 15. Juli, Seite 1589-94
Auteur principal: Ghiani, Gianpaolo (Auteur)
Autres auteurs: Guerriero, Emanuela, Manni, Andrea, Manni, Emanuele, Potenza, Agostino
Format: Article en ligne
Langue:English
Publié: 2013
Accès à la collection:Waste management (New York, N.Y.)
Sujets:Journal Article Research Support, Non-U.S. Gov't
Description
Résumé:Copyright © 2013 Elsevier Ltd. All rights reserved.
Urban waste management is becoming an increasingly complex task, absorbing a huge amount of resources, and having a major environmental impact. The design of a waste management system consists in various activities, and one of these is related to the definition of shift schedules for both personnel and vehicles. This activity has a great incidence on the tactical and operational cost for companies. In this paper, we propose an integer programming model to find an optimal solution to the integrated problem. The aim is to determine optimal schedules at minimum cost. Moreover, we design a fast and effective heuristic to face large-size problems. Both approaches are tested on data from a real-world case in Southern Italy and compared to the current practice utilized by the company managing the service, showing that simultaneously solving these problems can lead to significant monetary savings
Description:Date Completed 06.01.2014
Date Revised 02.12.2018
published: Print-Electronic
Citation Status MEDLINE
ISSN:1879-2456
DOI:10.1016/j.wasman.2013.04.001