Effects of cycle time and fill time on the performance of an anaerobic-anoxic-aerobic-fed batch moving-bed reactor

Performance of a fed batch moving-bed reactor system arranged in anaerobic (B1)-anoxic (B2)-aerobic (B3) mode was investigated using cycle time (18-36h), gradual fill time (total 5-18.5 h; B1: 1-3.7 h; B2 and B3: 2-7.4 h each) and instantaneous fill time as variable parameters. During cycle time var...

Ausführliche Beschreibung

Bibliographische Detailangaben
Veröffentlicht in:Environmental technology. - 1998. - 34(2013), 1-4 vom: 19. Jan., Seite 245-56
1. Verfasser: Sahariah, Biju Prava (VerfasserIn)
Weitere Verfasser: Chakraborty, Saswati
Format: Aufsatz
Sprache:English
Veröffentlicht: 2013
Zugriff auf das übergeordnete Werk:Environmental technology
Schlagworte:Evaluation Study Journal Article Research Support, Non-U.S. Gov't Quaternary Ammonium Compounds Thiocyanates Phenol 339NCG44TV thiocyanate O748SU14OM
LEADER 01000caa a22002652 4500
001 NLM226143317
003 DE-627
005 20250215044126.0
007 tu
008 231224s2013 xx ||||| 00| ||eng c
028 5 2 |a pubmed25n0753.xml 
035 |a (DE-627)NLM226143317 
035 |a (NLM)23530337 
040 |a DE-627  |b ger  |c DE-627  |e rakwb 
041 |a eng 
100 1 |a Sahariah, Biju Prava  |e verfasserin  |4 aut 
245 1 0 |a Effects of cycle time and fill time on the performance of an anaerobic-anoxic-aerobic-fed batch moving-bed reactor 
264 1 |c 2013 
336 |a Text  |b txt  |2 rdacontent 
337 |a ohne Hilfsmittel zu benutzen  |b n  |2 rdamedia 
338 |a Band  |b nc  |2 rdacarrier 
500 |a Date Completed 13.06.2013 
500 |a Date Revised 10.12.2019 
500 |a published: Print 
500 |a Citation Status MEDLINE 
520 |a Performance of a fed batch moving-bed reactor system arranged in anaerobic (B1)-anoxic (B2)-aerobic (B3) mode was investigated using cycle time (18-36h), gradual fill time (total 5-18.5 h; B1: 1-3.7 h; B2 and B3: 2-7.4 h each) and instantaneous fill time as variable parameters. During cycle time variation, total hydraulic retention time changed from 4.5 to 9 days (B1: 2.25-4.5 days; B2 and B3: 1.13-2.25 days each). Synthetic wastewater contained phenol (1500 mg/l), thiocyanate (SCN(-)800 mg/l at gradual fill and 100 mg/l at instantaneous fill) and ammonia (NH4(+)-N 500 mg/l). Phenol and chemical oxygen demand (COD) removals in B1 increased with increase in cycle time and gradual shorter filling showed higher performance than gradual long filling and instantaneous filling. In B2, simultaneous removals of phenol, SCN, COD and NO3(-)-N were achieved and effects of cycle time and fill times were not profound. In B3, NH4(+)-N removal efficiency increased with increase in both cycle time and gradual fill time. The minimum cycle time of 30 h and total hydraulic retention time of 7.5 days and total fill time of 12.5 h were recommended. A modified Stover-Kincannon model showed the highest correlation for removal of substrates in B1, B2 and B3 
650 4 |a Evaluation Study 
650 4 |a Journal Article 
650 4 |a Research Support, Non-U.S. Gov't 
650 7 |a Quaternary Ammonium Compounds  |2 NLM 
650 7 |a Thiocyanates  |2 NLM 
650 7 |a Phenol  |2 NLM 
650 7 |a 339NCG44TV  |2 NLM 
650 7 |a thiocyanate  |2 NLM 
650 7 |a O748SU14OM  |2 NLM 
700 1 |a Chakraborty, Saswati  |e verfasserin  |4 aut 
773 0 8 |i Enthalten in  |t Environmental technology  |d 1998  |g 34(2013), 1-4 vom: 19. Jan., Seite 245-56  |w (DE-627)NLM098202545  |x 0959-3330  |7 nnns 
773 1 8 |g volume:34  |g year:2013  |g number:1-4  |g day:19  |g month:01  |g pages:245-56 
912 |a GBV_USEFLAG_A 
912 |a SYSFLAG_A 
912 |a GBV_NLM 
912 |a GBV_ILN_350 
951 |a AR 
952 |d 34  |j 2013  |e 1-4  |b 19  |c 01  |h 245-56