A risk-based approach to improve monitoring and performance of remote waste stabilisation ponds

A cost-effective risk-based system was developed for assessing the performance and potential environmental impact of a large number of geographically dispersed pond systems, where cost and logistical issues prevent direct monitoring. In the process, a range of risk functions were calculated for each...

Ausführliche Beschreibung

Bibliographische Detailangaben
Veröffentlicht in:Water science and technology : a journal of the International Association on Water Pollution Research. - 1986. - 66(2012), 8 vom: 01., Seite 1735-42
1. Verfasser: Sweeney, D G (VerfasserIn)
Weitere Verfasser: Louey-Gung, J, Dysart, A
Format: Online-Aufsatz
Sprache:English
Veröffentlicht: 2012
Zugriff auf das übergeordnete Werk:Water science and technology : a journal of the International Association on Water Pollution Research
Schlagworte:Journal Article
LEADER 01000caa a22002652 4500
001 NLM220364583
003 DE-627
005 20250214082742.0
007 cr uuu---uuuuu
008 231224s2012 xx |||||o 00| ||eng c
024 7 |a 10.2166/wst.2012.400  |2 doi 
028 5 2 |a pubmed25n0734.xml 
035 |a (DE-627)NLM220364583 
035 |a (NLM)22907459 
040 |a DE-627  |b ger  |c DE-627  |e rakwb 
041 |a eng 
100 1 |a Sweeney, D G  |e verfasserin  |4 aut 
245 1 2 |a A risk-based approach to improve monitoring and performance of remote waste stabilisation ponds 
264 1 |c 2012 
336 |a Text  |b txt  |2 rdacontent 
337 |a ƒaComputermedien  |b c  |2 rdamedia 
338 |a ƒa Online-Ressource  |b cr  |2 rdacarrier 
500 |a Date Completed 27.11.2012 
500 |a Date Revised 21.08.2012 
500 |a published: Print 
500 |a Citation Status MEDLINE 
520 |a A cost-effective risk-based system was developed for assessing the performance and potential environmental impact of a large number of geographically dispersed pond systems, where cost and logistical issues prevent direct monitoring. In the process, a range of risk functions were calculated for each site to take into account pond performance, receiving environment, influent quality, surrounding land use and system size. Pond performance was estimated using traditional design equations, including Monte Carlo analysis to account for uncertainty in boundary conditions. The calculation of combined risk functions for all systems enabled the quantitative ranking of systems, which can be used to prioritise limited sampling resources 
650 4 |a Journal Article 
700 1 |a Louey-Gung, J  |e verfasserin  |4 aut 
700 1 |a Dysart, A  |e verfasserin  |4 aut 
773 0 8 |i Enthalten in  |t Water science and technology : a journal of the International Association on Water Pollution Research  |d 1986  |g 66(2012), 8 vom: 01., Seite 1735-42  |w (DE-627)NLM098149431  |x 0273-1223  |7 nnns 
773 1 8 |g volume:66  |g year:2012  |g number:8  |g day:01  |g pages:1735-42 
856 4 0 |u http://dx.doi.org/10.2166/wst.2012.400  |3 Volltext 
912 |a GBV_USEFLAG_A 
912 |a SYSFLAG_A 
912 |a GBV_NLM 
912 |a GBV_ILN_350 
951 |a AR 
952 |d 66  |j 2012  |e 8  |b 01  |h 1735-42