Reclamation of the wastewater from an industrial park using hollow-fibre and spiral-wound membranes : 50 m3 d(-1) pilot testing and cost evaluation

The feasibility of reclaiming effluent from industrial park wastewater treatment plants through a membrane process was evaluated in three phases. In phase 1 we selected nine wastewater treatment plants (WWTPs), each with a design capacity exceeding 10,000 m3 d(-1), and analyzed the corresponding eff...