|
|
|
|
LEADER |
01000caa a22002652c 4500 |
001 |
NLM185877443 |
003 |
DE-627 |
005 |
20250210031342.0 |
007 |
cr uuu---uuuuu |
008 |
231223s2009 xx |||||o 00| ||eng c |
024 |
7 |
|
|a 10.1016/j.wasman.2008.12.016
|2 doi
|
028 |
5 |
2 |
|a pubmed25n0620.xml
|
035 |
|
|
|a (DE-627)NLM185877443
|
035 |
|
|
|a (NLM)19157840
|
040 |
|
|
|a DE-627
|b ger
|c DE-627
|e rakwb
|
041 |
|
|
|a eng
|
100 |
1 |
|
|a Batool, Syeda Adila
|e verfasserin
|4 aut
|
245 |
1 |
0 |
|a Municipal solid waste management in Lahore City District, Pakistan
|
264 |
|
1 |
|c 2009
|
336 |
|
|
|a Text
|b txt
|2 rdacontent
|
337 |
|
|
|a ƒaComputermedien
|b c
|2 rdamedia
|
338 |
|
|
|a ƒa Online-Ressource
|b cr
|2 rdacarrier
|
500 |
|
|
|a Date Completed 16.07.2009
|
500 |
|
|
|a Date Revised 01.12.2018
|
500 |
|
|
|a published: Print-Electronic
|
500 |
|
|
|a Citation Status MEDLINE
|
520 |
|
|
|a This study deals with generation, composition, collection, transportation, and disposal, as well as the present cost of the waste management on the basis of 60% collection of the total waste and the cost of proposed improved system of management on the basis of 100% waste collection using the IWM-2 LCI model. A GIS map of Data Ganj Bakhsh Town (DGBT) of Lahore City District showing communal storage facilities is also provided. DGBT has a population of 1,624,169 living in 232,024 dwellings. The total waste generated per year is 500,000 tons, or 0.84/kg/cap/day. Presently 60% of the MSW is collected and disposed in open dumps, while 40% is not collected and lies along roadsides, streets railway lines, depressions, vacant plots, drains, storm drains and open sewers. In DGBT, 129 containers of 5-m(3) capacity, 120 containers of 10-m(3) capacity and 380 skips of 2.5-m(3) capacity are placed for waste collection. The overall collection and disposal cost of the MSW of DGBT is $3,177,900/yr, which is $10.29/ton. Modeling was conducted using the IWM-2 model for improved collection and disposal on the basis of 100% service, compared to the current 60% service. The modelled cost is $8.3/per ton, which is 20% less than the present cost, but the overall cost of 100% collection and disposal increases to $4,155,737/yr
|
650 |
|
4 |
|a Journal Article
|
700 |
1 |
|
|a Ch, Muhammad Nawaz
|e verfasserin
|4 aut
|
773 |
0 |
8 |
|i Enthalten in
|t Waste management (New York, N.Y.)
|d 1999
|g 29(2009), 6 vom: 01. Juni, Seite 1971-81
|w (DE-627)NLM098197061
|x 1879-2456
|7 nnas
|
773 |
1 |
8 |
|g volume:29
|g year:2009
|g number:6
|g day:01
|g month:06
|g pages:1971-81
|
856 |
4 |
0 |
|u http://dx.doi.org/10.1016/j.wasman.2008.12.016
|3 Volltext
|
912 |
|
|
|a GBV_USEFLAG_A
|
912 |
|
|
|a SYSFLAG_A
|
912 |
|
|
|a GBV_NLM
|
912 |
|
|
|a GBV_ILN_350
|
951 |
|
|
|a AR
|
952 |
|
|
|d 29
|j 2009
|e 6
|b 01
|c 06
|h 1971-81
|