Present status and performance of SPring-8 front ends

SPring-8 front ends have a novel structure which makes it easy to rearrange them and exchange the components. The structure has a common support for all the components except X-ray beam-position monitors and lead collimators. The alignment of the common support as well as the components was carried...

Ausführliche Beschreibung

Bibliographische Detailangaben
Veröffentlicht in:Journal of synchrotron radiation. - 1994. - 5(1998), Pt 4 vom: 01. Juli, Seite 1195-8
1. Verfasser: Sakurai, Y (VerfasserIn)
Weitere Verfasser: Oura, M, Takahashi, S, Hayashi, Y, Aoyagi, H, Shiwaku, H, Kudo, T, Mochizuki, T, Oikawa, Y, Takahasi, M, Yoshii, K, Kitamura, H
Format: Aufsatz
Sprache:English
Veröffentlicht: 1998
Zugriff auf das übergeordnete Werk:Journal of synchrotron radiation
Schlagworte:Journal Article
LEADER 01000naa a22002652 4500
001 NLM162696809
003 DE-627
005 20231223094753.0
007 tu
008 231223s1998 xx ||||| 00| ||eng c
028 5 2 |a pubmed24n0542.xml 
035 |a (DE-627)NLM162696809 
035 |a (NLM)16687819 
040 |a DE-627  |b ger  |c DE-627  |e rakwb 
041 |a eng 
100 1 |a Sakurai, Y  |e verfasserin  |4 aut 
245 1 0 |a Present status and performance of SPring-8 front ends 
264 1 |c 1998 
336 |a Text  |b txt  |2 rdacontent 
337 |a ohne Hilfsmittel zu benutzen  |b n  |2 rdamedia 
338 |a Band  |b nc  |2 rdacarrier 
500 |a Date Completed 24.04.2008 
500 |a Date Revised 11.05.2006 
500 |a published: Print 
500 |a Citation Status PubMed-not-MEDLINE 
520 |a SPring-8 front ends have a novel structure which makes it easy to rearrange them and exchange the components. The structure has a common support for all the components except X-ray beam-position monitors and lead collimators. The alignment of the common support as well as the components was carried out with an accuracy of 0.25 mm in the vertical and horizontal directions. Replaceable pumping systems have also been placed on the common support and have achieved a vacuum of 2 x 10(-8) Pa at the upstream part of the front ends without synchrotron radiation. During the commissioning with synchrotron radiation, the pumping systems displayed good pumping-down characteristics. Commissioning has been successfully performed for four standard in-vacuum X-ray undulators and three bending-magnet-beamline front ends up to July 1997. Measurements of temperature rise show that absorber, pre-slits and XY slits can handle the anticipated maximum heat load at a ring current of 100 mA 
650 4 |a Journal Article 
700 1 |a Oura, M  |e verfasserin  |4 aut 
700 1 |a Takahashi, S  |e verfasserin  |4 aut 
700 1 |a Hayashi, Y  |e verfasserin  |4 aut 
700 1 |a Aoyagi, H  |e verfasserin  |4 aut 
700 1 |a Shiwaku, H  |e verfasserin  |4 aut 
700 1 |a Kudo, T  |e verfasserin  |4 aut 
700 1 |a Mochizuki, T  |e verfasserin  |4 aut 
700 1 |a Oikawa, Y  |e verfasserin  |4 aut 
700 1 |a Takahasi, M  |e verfasserin  |4 aut 
700 1 |a Yoshii, K  |e verfasserin  |4 aut 
700 1 |a Kitamura, H  |e verfasserin  |4 aut 
773 0 8 |i Enthalten in  |t Journal of synchrotron radiation  |d 1994  |g 5(1998), Pt 4 vom: 01. Juli, Seite 1195-8  |w (DE-627)NLM09824129X  |x 1600-5775  |7 nnns 
773 1 8 |g volume:5  |g year:1998  |g number:Pt 4  |g day:01  |g month:07  |g pages:1195-8 
912 |a GBV_USEFLAG_A 
912 |a SYSFLAG_A 
912 |a GBV_NLM 
912 |a GBV_ILN_40 
912 |a GBV_ILN_350 
912 |a GBV_ILN_2005 
951 |a AR 
952 |d 5  |j 1998  |e Pt 4  |b 01  |c 07  |h 1195-8