SPring-8 in-vacuum undulator beam test at the ESRF
Before the commissioning of SPring-8, the in-vacuum hybrid undulator developed at SPring-8 had been brought to the ESRF for the first beam test in the summer of 1996. The purpose of this test was to investigate the influence of the in-vacuum undulator on the beam and check its vacuum system. However...
Veröffentlicht in: | Journal of synchrotron radiation. - 1994. - 5(1998), Pt 3 vom: 01. Mai, Seite 406-8 |
---|---|
1. Verfasser: | |
Weitere Verfasser: | , , , , , , , , |
Format: | Aufsatz |
Sprache: | English |
Veröffentlicht: |
1998
|
Zugriff auf das übergeordnete Werk: | Journal of synchrotron radiation |
Schlagworte: | Journal Article |
Zusammenfassung: | Before the commissioning of SPring-8, the in-vacuum hybrid undulator developed at SPring-8 had been brought to the ESRF for the first beam test in the summer of 1996. The purpose of this test was to investigate the influence of the in-vacuum undulator on the beam and check its vacuum system. However, heating by the resistive wall impedance turned out to be a critical issue for the in-vacuum undulators |
---|---|
Beschreibung: | Date Completed 02.10.2012 Date Revised 20.07.2004 published: Print-Electronic Citation Status PubMed-not-MEDLINE |
ISSN: | 1600-5775 |