SPring-8 in-vacuum undulator beam test at the ESRF

Before the commissioning of SPring-8, the in-vacuum hybrid undulator developed at SPring-8 had been brought to the ESRF for the first beam test in the summer of 1996. The purpose of this test was to investigate the influence of the in-vacuum undulator on the beam and check its vacuum system. However...

Ausführliche Beschreibung

Bibliographische Detailangaben
Veröffentlicht in:Journal of synchrotron radiation. - 1994. - 5(1998), Pt 3 vom: 01. Mai, Seite 406-8
1. Verfasser: Hara, T (VerfasserIn)
Weitere Verfasser: Tanaka, T, Tanabe, T, Maréchal, X M, Kitamura, H, Elleaume, P, Morrison, B, Chavanne, J, Van Vaerenbergh, P, Schmidt, D
Format: Aufsatz
Sprache:English
Veröffentlicht: 1998
Zugriff auf das übergeordnete Werk:Journal of synchrotron radiation
Schlagworte:Journal Article
Beschreibung
Zusammenfassung:Before the commissioning of SPring-8, the in-vacuum hybrid undulator developed at SPring-8 had been brought to the ESRF for the first beam test in the summer of 1996. The purpose of this test was to investigate the influence of the in-vacuum undulator on the beam and check its vacuum system. However, heating by the resistive wall impedance turned out to be a critical issue for the in-vacuum undulators
Beschreibung:Date Completed 02.10.2012
Date Revised 20.07.2004
published: Print-Electronic
Citation Status PubMed-not-MEDLINE