Alternatives for upgrading the Wilderness Wastewater Treatment Plant for biological nutrient removal

The Wilderness Wastewater Treatment Plant (WWTP) located in Orange County, Virginia is a four concentric ring oxidation ditch activated sludge system with a rated capacity of 1,935 m3/day. The three outer rings are used for wastewater treatment and the inner ring is used as an aerobic digester. The...

Description complète

Détails bibliographiques
Publié dans:Water science and technology : a journal of the International Association on Water Pollution Research. - 1986. - 48(2003), 11-12 vom: 24., Seite 453-62
Auteur principal: Cokgor, E U (Auteur)
Autres auteurs: Randall, C W
Format: Article
Langue:English
Publié: 2003
Accès à la collection:Water science and technology : a journal of the International Association on Water Pollution Research
Sujets:Journal Article Phosphorus 27YLU75U4W Nitrogen N762921K75
LEADER 01000caa a22002652c 4500
001 NLM144587521
003 DE-627
005 20250205070818.0
007 tu
008 231223s2003 xx ||||| 00| ||eng c
028 5 2 |a pubmed25n0482.xml 
035 |a (DE-627)NLM144587521 
035 |a (NLM)14753568 
040 |a DE-627  |b ger  |c DE-627  |e rakwb 
041 |a eng 
100 1 |a Cokgor, E U  |e verfasserin  |4 aut 
245 1 0 |a Alternatives for upgrading the Wilderness Wastewater Treatment Plant for biological nutrient removal 
264 1 |c 2003 
336 |a Text  |b txt  |2 rdacontent 
337 |a ohne Hilfsmittel zu benutzen  |b n  |2 rdamedia 
338 |a Band  |b nc  |2 rdacarrier 
500 |a Date Completed 27.04.2004 
500 |a Date Revised 21.11.2013 
500 |a published: Print 
500 |a Citation Status MEDLINE 
520 |a The Wilderness Wastewater Treatment Plant (WWTP) located in Orange County, Virginia is a four concentric ring oxidation ditch activated sludge system with a rated capacity of 1,935 m3/day. The three outer rings are used for wastewater treatment and the inner ring is used as an aerobic digester. The flow capacity has been increased from 1,935 to 3,760 m3/d, however, the desired design capacity has since been increased to 3,870 m3/d, and there are plans to eventually expand to approximately 4,840 m3/d with improved nitrogen removal. The design goal for the planned upgrade is to discharge an effluent that contains less than 10 mg/l total nitrogen (TN) at all times, with an annual average of 8 mg/l or less. In this study, the pre-upgrade performance of the Wilderness Wastewater Treatment Plant was evaluated and several modifications were recommended for the incorporation of biological nutrient removal (BNR) 
650 4 |a Journal Article 
650 7 |a Phosphorus  |2 NLM 
650 7 |a 27YLU75U4W  |2 NLM 
650 7 |a Nitrogen  |2 NLM 
650 7 |a N762921K75  |2 NLM 
700 1 |a Randall, C W  |e verfasserin  |4 aut 
773 0 8 |i Enthalten in  |t Water science and technology : a journal of the International Association on Water Pollution Research  |d 1986  |g 48(2003), 11-12 vom: 24., Seite 453-62  |w (DE-627)NLM098149431  |x 0273-1223  |7 nnas 
773 1 8 |g volume:48  |g year:2003  |g number:11-12  |g day:24  |g pages:453-62 
912 |a GBV_USEFLAG_A 
912 |a SYSFLAG_A 
912 |a GBV_NLM 
912 |a GBV_ILN_350 
951 |a AR 
952 |d 48  |j 2003  |e 11-12  |b 24  |h 453-62