Upgrading the Sjölunda WWTP according to a novel process concept

The Sjölunda wastewater treatment plant in Malmö, Sweden, was upgraded for extended nutrient removal in 1998-1999. The design was based on future effluent standards of 10 mg BOD7/l, 0.3 mg total-P/l and 8 mg total-N/l. The upgrading concept took into consideration existing processes and structures,...

Ausführliche Beschreibung

Bibliographische Detailangaben
Veröffentlicht in:Water science and technology : a journal of the International Association on Water Pollution Research. - 1986. - 47(2003), 12 vom: 19., Seite 1-7
1. Verfasser: Hanner, N (VerfasserIn)
Weitere Verfasser: Aspegren, H, Nyberg, U, Andersson, B
Format: Aufsatz
Sprache:English
Veröffentlicht: 2003
Zugriff auf das übergeordnete Werk:Water science and technology : a journal of the International Association on Water Pollution Research
Schlagworte:Journal Article Nitrogen N762921K75
LEADER 01000caa a22002652 4500
001 NLM126783551
003 DE-627
005 20250204053912.0
007 tu
008 231222s2003 xx ||||| 00| ||eng c
028 5 2 |a pubmed25n0423.xml 
035 |a (DE-627)NLM126783551 
035 |a (NLM)12926663 
040 |a DE-627  |b ger  |c DE-627  |e rakwb 
041 |a eng 
100 1 |a Hanner, N  |e verfasserin  |4 aut 
245 1 0 |a Upgrading the Sjölunda WWTP according to a novel process concept 
264 1 |c 2003 
336 |a Text  |b txt  |2 rdacontent 
337 |a ohne Hilfsmittel zu benutzen  |b n  |2 rdamedia 
338 |a Band  |b nc  |2 rdacarrier 
500 |a Date Completed 12.11.2003 
500 |a Date Revised 21.11.2013 
500 |a published: Print 
500 |a Citation Status MEDLINE 
520 |a The Sjölunda wastewater treatment plant in Malmö, Sweden, was upgraded for extended nutrient removal in 1998-1999. The design was based on future effluent standards of 10 mg BOD7/l, 0.3 mg total-P/l and 8 mg total-N/l. The upgrading concept took into consideration existing processes and structures, resulting in a cost-effective and compact upgrading. To introduce nitrification, the existing trickling filters for BOD-removal were converted to a nitrifying mode. A sequencing batch reactor for nitrification of supernatant was necessary to control the ammonia load. Denitrification was accomplished in a moving bed biofilm reactor with addition of external carbon source. The future effluent standards could be met by the upgraded plant. The trickling filters were stable despite varying loading conditions. High rates and low effluent ammonia concentrations were achieved. Essential features for stable post denitrification were control strategies for carbon source dosage and avoiding phosphorus limitation 
650 4 |a Journal Article 
650 7 |a Nitrogen  |2 NLM 
650 7 |a N762921K75  |2 NLM 
700 1 |a Aspegren, H  |e verfasserin  |4 aut 
700 1 |a Nyberg, U  |e verfasserin  |4 aut 
700 1 |a Andersson, B  |e verfasserin  |4 aut 
773 0 8 |i Enthalten in  |t Water science and technology : a journal of the International Association on Water Pollution Research  |d 1986  |g 47(2003), 12 vom: 19., Seite 1-7  |w (DE-627)NLM098149431  |x 0273-1223  |7 nnns 
773 1 8 |g volume:47  |g year:2003  |g number:12  |g day:19  |g pages:1-7 
912 |a GBV_USEFLAG_A 
912 |a SYSFLAG_A 
912 |a GBV_NLM 
912 |a GBV_ILN_350 
951 |a AR 
952 |d 47  |j 2003  |e 12  |b 19  |h 1-7