Extrapolation of wind data using generalized versus site-specific wind power law for wind power production prospective at Shahbandar-a coastal site in Pakistan

The aim of this work is to compare the wind data extrapolated by 1/7th wind power law and site-specific wind power law for wind power potential estimation at Shahbandar. Both the Wind shear exponents (WSE) and local air density values were calculated using measured wind data at 10 and 30 m heights a...

Description complète

Détails bibliographiques
Publié dans:Energy Exploration & Exploitation. - Sage Publications, Inc.. - 39(2021), 6, Seite 2240-2256
Auteur principal: Sumair, Muhammad (Auteur)
Autres auteurs: Aized, Tauseef, Gardezi, Syed Asad Raza
Format: Article en ligne
Langue:English
Publié: 2021
Accès à la collection:Energy Exploration & Exploitation
LEADER 01000naa a22002652c 4500
001 JST141337532
003 DE-627
005 20250107175149.0
007 cr uuu---uuuuu
008 250107s2021 xx |||||o 00| ||eng c
035 |a (DE-627)JST141337532 
035 |a (JST)27166829 
040 |a DE-627  |b ger  |c DE-627  |e rakwb 
041 |a eng 
100 1 |a Sumair, Muhammad  |e verfasserin  |4 aut 
245 1 0 |a Extrapolation of wind data using generalized versus site-specific wind power law for wind power production prospective at Shahbandar-a coastal site in Pakistan 
264 1 |c 2021 
336 |a Text  |b txt  |2 rdacontent 
337 |a Computermedien  |b c  |2 rdamedia 
338 |a Online-Ressource  |b cr  |2 rdacarrier 
520 |a The aim of this work is to compare the wind data extrapolated by 1/7th wind power law and site-specific wind power law for wind power potential estimation at Shahbandar. Both the Wind shear exponents (WSE) and local air density values were calculated using measured wind data at 10 and 30 m heights and they were found minimum in summer and maximum in winter. Weibull distribution was applied with a newly developed method to estimate the Weibull parameters whose accuracy was tested using coefficient of determination which was more than 95%. Technical analysis of energy generation was conducted which showed that GE1 and GE2 turbines have highest yield and capacity factors respectively while B3 and V5 has corresponding minimum values. Comparison showed that 1/7th wind power estimates lower values of wind potential than site-specific wind power law. Moreover, comparison of predicted data with measured data shows that site-specific wind power law estimates data more accurately. 
540 |a © The Author(s) 2020 
655 4 |a research-article 
700 1 |a Aized, Tauseef  |e verfasserin  |4 aut 
700 1 |a Gardezi, Syed Asad Raza  |e verfasserin  |4 aut 
773 0 8 |i Enthalten in  |t Energy Exploration & Exploitation  |d Sage Publications, Inc.  |g 39(2021), 6, Seite 2240-2256  |w (DE-627)321179307  |w (DE-600)2026571-2  |x 20484054  |7 nnas 
773 1 8 |g volume:39  |g year:2021  |g number:6  |g pages:2240-2256 
856 4 0 |u https://www.jstor.org/stable/27166829  |3 Volltext 
912 |a GBV_USEFLAG_A 
912 |a SYSFLAG_A 
912 |a GBV_JST 
912 |a GBV_ILN_11 
912 |a GBV_ILN_20 
912 |a GBV_ILN_22 
912 |a GBV_ILN_23 
912 |a GBV_ILN_24 
912 |a GBV_ILN_31 
912 |a GBV_ILN_39 
912 |a GBV_ILN_40 
912 |a GBV_ILN_60 
912 |a GBV_ILN_62 
912 |a GBV_ILN_63 
912 |a GBV_ILN_65 
912 |a GBV_ILN_69 
912 |a GBV_ILN_70 
912 |a GBV_ILN_72 
912 |a GBV_ILN_73 
912 |a GBV_ILN_95 
912 |a GBV_ILN_100 
912 |a GBV_ILN_105 
912 |a GBV_ILN_110 
912 |a GBV_ILN_151 
912 |a GBV_ILN_161 
912 |a GBV_ILN_170 
912 |a GBV_ILN_213 
912 |a GBV_ILN_230 
912 |a GBV_ILN_285 
912 |a GBV_ILN_293 
912 |a GBV_ILN_370 
912 |a GBV_ILN_374 
912 |a GBV_ILN_602 
912 |a GBV_ILN_2001 
912 |a GBV_ILN_2003 
912 |a GBV_ILN_2005 
912 |a GBV_ILN_2006 
912 |a GBV_ILN_2007 
912 |a GBV_ILN_2008 
912 |a GBV_ILN_2009 
912 |a GBV_ILN_2010 
912 |a GBV_ILN_2014 
912 |a GBV_ILN_2015 
912 |a GBV_ILN_2018 
912 |a GBV_ILN_2020 
912 |a GBV_ILN_2021 
912 |a GBV_ILN_2026 
912 |a GBV_ILN_2044 
912 |a GBV_ILN_2050 
912 |a GBV_ILN_2056 
912 |a GBV_ILN_2057 
912 |a GBV_ILN_2107 
912 |a GBV_ILN_2706 
912 |a GBV_ILN_2707 
912 |a GBV_ILN_2890 
912 |a GBV_ILN_2949 
912 |a GBV_ILN_2950 
912 |a GBV_ILN_2954 
912 |a GBV_ILN_4012 
912 |a GBV_ILN_4027 
912 |a GBV_ILN_4028 
912 |a GBV_ILN_4035 
912 |a GBV_ILN_4037 
912 |a GBV_ILN_4046 
912 |a GBV_ILN_4112 
912 |a GBV_ILN_4125 
912 |a GBV_ILN_4126 
912 |a GBV_ILN_4242 
912 |a GBV_ILN_4249 
912 |a GBV_ILN_4305 
912 |a GBV_ILN_4306 
912 |a GBV_ILN_4307 
912 |a GBV_ILN_4309 
912 |a GBV_ILN_4310 
912 |a GBV_ILN_4313 
912 |a GBV_ILN_4314 
912 |a GBV_ILN_4316 
912 |a GBV_ILN_4317 
912 |a GBV_ILN_4319 
912 |a GBV_ILN_4322 
912 |a GBV_ILN_4323 
912 |a GBV_ILN_4324 
912 |a GBV_ILN_4325 
912 |a GBV_ILN_4335 
912 |a GBV_ILN_4338 
912 |a GBV_ILN_4346 
912 |a GBV_ILN_4367 
912 |a GBV_ILN_4393 
912 |a GBV_ILN_4700 
951 |a AR 
952 |d 39  |j 2021  |e 6  |h 2240-2256