Renovation of Public Housing: Suggestions from a Simple Model

This paper presents a simple model to contrast the benefit and cost of renovating public housing units against the benefit and cost of building new ones. Benefit is measured as the additional expected life created, and empirically-estimated survivor functions for housing are used to calculate maximu...

Ausführliche Beschreibung

Bibliographische Detailangaben
Veröffentlicht in:Management Science. - Institute for Operations Research and the Management Sciences, 1954. - 38(1992), 5, Seite 655-666
1. Verfasser: Gleeson, Michael E. (VerfasserIn)
Format: Online-Aufsatz
Sprache:English
Veröffentlicht: 1992
Zugriff auf das übergeordnete Werk:Management Science
Schlagworte:Government Services Resource Allocation Public Program Evaluation Reliability Theory-Applications Applied sciences Social sciences Mathematics Business Economics
LEADER 01000caa a22002652 4500
001 JST056234899
003 DE-627
005 20240622021319.0
007 cr uuu---uuuuu
008 150324s1992 xx |||||o 00| ||eng c
035 |a (DE-627)JST056234899 
035 |a (JST)2632683 
040 |a DE-627  |b ger  |c DE-627  |e rakwb 
041 |a eng 
100 1 |a Gleeson, Michael E.  |e verfasserin  |4 aut 
245 1 0 |a Renovation of Public Housing: Suggestions from a Simple Model 
264 1 |c 1992 
336 |a Text  |b txt  |2 rdacontent 
337 |a Computermedien  |b c  |2 rdamedia 
338 |a Online-Ressource  |b cr  |2 rdacarrier 
520 |a This paper presents a simple model to contrast the benefit and cost of renovating public housing units against the benefit and cost of building new ones. Benefit is measured as the additional expected life created, and empirically-estimated survivor functions for housing are used to calculate maximum costs at which renovation is cost-effective relative to new construction. Actual renovation costs for an existing program are compared with calculated maximums. Results suggest that past renovation practice may not have been cost-effective relative to new construction. Possible changes in program guidelines are presented. The paper concludes with a discussion of policy implications. 
540 |a Copyright 1992 The Institute of Management Sciences 
650 4 |a Government Services 
650 4 |a Resource Allocation 
650 4 |a Public Program Evaluation 
650 4 |a Reliability Theory-Applications 
650 4 |a Applied sciences  |x Engineering  |x Civil engineering  |x Construction engineering  |x Renovations 
650 4 |a Social sciences  |x Human geography  |x Housing  |x Public housing 
650 4 |a Mathematics  |x Mathematical values  |x Ratios 
650 4 |a Social sciences  |x Human geography  |x Housing 
650 4 |a Business  |x Accountancy  |x Financial accounting  |x Business expenses  |x Variable costs  |x Construction costs 
650 4 |a Economics  |x Economic disciplines  |x Applied economics  |x Economic modeling  |x Microeconomic modeling  |x Cost benefit ratio 
650 4 |a Business  |x Business economics  |x Commercial production  |x Production factors  |x Production costs  |x Unit costs 
650 4 |a Mathematics  |x Applied mathematics  |x Statistics  |x Applied statistics  |x Descriptive statistics  |x Statistical distributions  |x Distribution functions  |x Probability distributions  |x Continuous probability distributions  |x Density distributions  |x Reliability functions 
650 4 |a Economics  |x Microeconomics  |x Economic costs and benefits  |x Economic costs  |x Cost efficiency 
650 4 |a Economics  |x Microeconomics  |x Economic costs and benefits  |x Economic costs  |x Cost functions 
655 4 |a research-article 
773 0 8 |i Enthalten in  |t Management Science  |d Institute for Operations Research and the Management Sciences, 1954  |g 38(1992), 5, Seite 655-666  |w (DE-627)320623602  |w (DE-600)2023019-9  |x 15265501  |7 nnns 
773 1 8 |g volume:38  |g year:1992  |g number:5  |g pages:655-666 
856 4 0 |u https://www.jstor.org/stable/2632683  |3 Volltext 
912 |a GBV_USEFLAG_A 
912 |a SYSFLAG_A 
912 |a GBV_JST 
912 |a GBV_ILN_11 
912 |a GBV_ILN_20 
912 |a GBV_ILN_22 
912 |a GBV_ILN_23 
912 |a GBV_ILN_24 
912 |a GBV_ILN_31 
912 |a GBV_ILN_32 
912 |a GBV_ILN_39 
912 |a GBV_ILN_40 
912 |a GBV_ILN_60 
912 |a GBV_ILN_62 
912 |a GBV_ILN_63 
912 |a GBV_ILN_65 
912 |a GBV_ILN_69 
912 |a GBV_ILN_70 
912 |a GBV_ILN_90 
912 |a GBV_ILN_95 
912 |a GBV_ILN_100 
912 |a GBV_ILN_110 
912 |a GBV_ILN_120 
912 |a GBV_ILN_152 
912 |a GBV_ILN_187 
912 |a GBV_ILN_224 
912 |a GBV_ILN_285 
912 |a GBV_ILN_374 
912 |a GBV_ILN_702 
912 |a GBV_ILN_2001 
912 |a GBV_ILN_2003 
912 |a GBV_ILN_2005 
912 |a GBV_ILN_2006 
912 |a GBV_ILN_2007 
912 |a GBV_ILN_2008 
912 |a GBV_ILN_2009 
912 |a GBV_ILN_2010 
912 |a GBV_ILN_2011 
912 |a GBV_ILN_2014 
912 |a GBV_ILN_2015 
912 |a GBV_ILN_2018 
912 |a GBV_ILN_2020 
912 |a GBV_ILN_2021 
912 |a GBV_ILN_2026 
912 |a GBV_ILN_2027 
912 |a GBV_ILN_2034 
912 |a GBV_ILN_2044 
912 |a GBV_ILN_2048 
912 |a GBV_ILN_2050 
912 |a GBV_ILN_2055 
912 |a GBV_ILN_2056 
912 |a GBV_ILN_2057 
912 |a GBV_ILN_2059 
912 |a GBV_ILN_2061 
912 |a GBV_ILN_2065 
912 |a GBV_ILN_2068 
912 |a GBV_ILN_2106 
912 |a GBV_ILN_2107 
912 |a GBV_ILN_2108 
912 |a GBV_ILN_2111 
912 |a GBV_ILN_2112 
912 |a GBV_ILN_2113 
912 |a GBV_ILN_2118 
912 |a GBV_ILN_2122 
912 |a GBV_ILN_2129 
912 |a GBV_ILN_2143 
912 |a GBV_ILN_2147 
912 |a GBV_ILN_2148 
912 |a GBV_ILN_2152 
912 |a GBV_ILN_2153 
912 |a GBV_ILN_2190 
912 |a GBV_ILN_2232 
912 |a GBV_ILN_2472 
912 |a GBV_ILN_2935 
912 |a GBV_ILN_2940 
912 |a GBV_ILN_2949 
912 |a GBV_ILN_2950 
912 |a GBV_ILN_4012 
912 |a GBV_ILN_4035 
912 |a GBV_ILN_4037 
912 |a GBV_ILN_4046 
912 |a GBV_ILN_4112 
912 |a GBV_ILN_4125 
912 |a GBV_ILN_4126 
912 |a GBV_ILN_4242 
912 |a GBV_ILN_4246 
912 |a GBV_ILN_4249 
912 |a GBV_ILN_4251 
912 |a GBV_ILN_4305 
912 |a GBV_ILN_4306 
912 |a GBV_ILN_4307 
912 |a GBV_ILN_4313 
912 |a GBV_ILN_4322 
912 |a GBV_ILN_4323 
912 |a GBV_ILN_4324 
912 |a GBV_ILN_4325 
912 |a GBV_ILN_4326 
912 |a GBV_ILN_4335 
912 |a GBV_ILN_4338 
912 |a GBV_ILN_4346 
912 |a GBV_ILN_4393 
912 |a GBV_ILN_4700 
951 |a AR 
952 |d 38  |j 1992  |e 5  |h 655-666