Optimising the operation of a MBR pilot plant by quantitative analysis of the membrane fouling mechanism

In order to optimize some operational conditions of MBR systems, a MBR pilot plant equipped with a submerged hollow fibre membrane module was employed in this study. The pilot MBR was fed with real municipal wastewater and the filtration flux, backwashing interval, aeration frequency and temperature...

Description complète

Détails bibliographiques
Publié dans:Water science and technology : a journal of the International Association on Water Pollution Research. - 1986. - 51(2005), 6-7 vom: 29., Seite 19-25
Auteur principal: Jiang, T (Auteur)
Autres auteurs: Kennedy, M D, Guinzbourg, B F, Vanrolleghem, P A, Schippers, J C
Format: Article
Langue:English
Publié: 2005
Accès à la collection:Water science and technology : a journal of the International Association on Water Pollution Research
Sujets:Journal Article Membranes, Artificial